Change Orders represent a considerable risk for HVAC & mechanical contractors. They can drain cash and strain relationships with GCs. Between 5% and 30% of total project revenue is at risk.
Article content provided by Clearstory.
Clearstory bridges this gap with a purpose-built Change Order communication tool. Our cloud-based solution provides:
With Clearstory, HVAC and mechanical contractors can reduce revenue risk, improve cash flow, and boost team productivity. Ready to close the Change Order gap? Contact us for a demo today.
Visit the Clearstory website.
Have a question for Clearstory? Contact Clearstory here.
Clearstory’s mission is to make the entire construction industry more efficient by helping teams get extra work processed and closed faster to reduce risk, waste less time, and improve relationships. Our solutions make one of the country’s biggest industries a more fun and inspiring place to work.
Mar 25, 2025 — Products & Services Update
Apr 23, 2025 - Construction professionals currently spend 18% of their time searching for information on projects, relying on keyword searches and sifting through countless results to find answers.
Apr 23, 2025 - Lockformer Spiral Tube Former 2.0 is compact and fast, forming 3–100” pipe at up to 344 FPM. With Spiral Smart Tech, on-the-fly slitting and trailer-ready design, it ensures quiet, precise production.
Apr 23, 2025 - Designed for electricians, plumbers, and mechanical contractors, Milwaukee Tool's M18™ FORCE LOGIC™ Single Channel Strut Shear delivers precise measurements, consistent accuracy, and installation-ready cuts with no exposed blades.