Tune into the latest installment of SMACNA's management podcast to learn more about the challenges posed by project changes and the best practices for navigating unexpected events.
For the latest episode of the Operations Hub, Seth Lennon is joined by Ashley Duncan (General Sheet Metal) and Joe Samia (General Consolidated) for an in-depth discussion on the impact of change orders. The panel outlines some of the challenges posed by changes that occur during a project and some of the best practices that can be utilized when something unexpected happens.
Oct 9, 2024 — Member Update
Apr 16, 2025 - Relive all of the sights and sounds of SMACNA’s premier educational event centered on the ever-evolving world of fabrication!
Apr 16, 2025 - Tyfoom is the #1 engagement platform for employee communication and training. Tyfoom provides a simple and easy way to connect all employees with leaders every day to improve culture, productivity and employee engagement.
Apr 16, 2025 - Hugh Seaton joins Seth Lennon to talk about the work being done by SMACNA to help contractors successfully leverage AI.